| Prepped upper area with all holes covered with fiberglass except for table leg receptacle holes. |
| Using paper to make a template. |
| Template on the 1/2" marine grade plywood. I marked out a few of the previous attachment holes to help with alignment. I drilled these in the wood too. |
| Cut out. |
| I used a belt sander to feather out the edges a little more. note the three screws that I can use for alignment in the trailer. |
| After a few in and outs with the plywood, it fit well enough. the screwdrivers are through the plywood and in the old holes. |
| Note that I also drew the frame lines on the panel. This is so I can see them from inside the trailer when I am attaching things back to the frame for the placement of new screws. |
| I had mentioned the bathroom enclosure in another post. Back and forth it goes as I work in one area or another. |
| Draw everything out! Measure twice... cut once. (If only I listened to that advice...) |
| Cutting out the various shapes to get the overlapping pieces. |
| In and out... in and out... getting that edge to the right outline, and feathered out below correctly to match the radius of the trailer fiberglass. |
| More feathering with the belt sander. |
| After enough test fits, the pieces fit well. |
| Fitting well. |
| Now... to plan out which pieces I can laminate before I take them in. The Casita door only allows certain sized pieces in! |
| Frame lines on the upper layer for future reference. |
| And... notes to NOT drill into the holding tank!!! |
| In order to laminate it inside, I wouldn't be able to clamp. So I predrilled a bunch of small holes so I could put 1/2" screws in to hold the layers together. |
| What I'm using for fiberglass work, for coating wood to waterproof it, and also to laminate the plywood. |
| I should also mention that before I fiberglassed the holes from the inside, I put some paper under the Casita. I didn't want to glue it to my garage floor. |
| Showing how the pieces go together. |
| Laying down epoxy to laminate the piece that goes above it. |
| Screwing the piece down to the one below it. |
| What it will look like together. |
| Showing how it comes apart. These are the two pieces I need to get into the Casita. |
| Coating the bottom and edges with epoxy to further waterproof the marine grade plywood. |
| Don't forget that it gets a shower pan and toilet! |
| The shower pan has a beveled edge to allow it to drain to center. Angle grinder with a sanding disc. |
| Putting the shower pan and black water tank on top for a test fit. |
| Further sanding based on test fit. |
| Here's what it looks like before the floor goes in. |
| This shows the bottom layers in place. They already had the side pieces glued onto them. |
| Adding epoxy before I add the central top piece. |
| Moving the central top piece into the Casita. |
| Last chance to look... |
| Top piece in place and being screwed down to set it into the epoxy and laminate it to the lower piece. Floor is in!! |